APMDC Suliyari coal upcoming auction 1,10,000 for MP-MSMEs on 4th september @Rs.2,533/- per MT

APMDC Suliyari coal upcoming auction 3,30,000 MT for MP-MSMEs for Q2 2025-26

DSC operation manual - Notice

Login Register Contact Us
Purchase New DSC Welcome to Linkage e-Auctions Welcome to Coal Trading Portal Welcome to APMDC Suliyari Coal

Coal news and updates

MECL pulling down CMPDI’s drilling work

19 Apr 2016

The Central Mine Planning and Design Institute (CMPDI), which finished the year 2015-16 with lower-than-expected drilling of 9.94 lakh metres, has blamed it on the below par performance by MECL with which CMPDI has an outsourcing contract.

 

“MECL has under-performed during the year. In a sense, they are pulling us back,” said a source at CMPDI.

 

CMPDI had signed a MoU with MECL for outsourcing 2.5 lakh metres of drilling job in 2015-16, but the latter could not deliver the goods, the source said.

 

“MECL posted only a 4% growth year-on-year, while as a whole, CMPDI ended the year with 20% growth,” he said.

 

CMPDI achieved total drilling of 9.94 lakh metres in 2015-16, about 20% growth over 8.28 lakh metres achieved in the previous year, but lower than 10.5 lakh metres expected by the Coal India subsidiary.