APMDC Suliyari coal upcoming auction 1,10,000 for MP-MSMEs on 4th september @Rs.2,533/- per MT

APMDC Suliyari coal upcoming auction 3,30,000 MT for MP-MSMEs for Q2 2025-26

DSC operation manual - Notice

Login Register Contact Us
Purchase New DSC Welcome to Linkage e-Auctions Welcome to Coal Trading Portal Welcome to APMDC Suliyari Coal

Coal news and updates

South Korean utility KOMIPO invites bituminous coal bids for Boryeong power plant

10 Aug 2015

South Korean state-owned utility Korea Midland Power (KOMIPO) issued an new tender for 560,000 Metric Tons (MT) of 4,600kcal/kg NAR coal for OCT 2015  – Q2 2016 loading for Boryeong Power Plant.

The total 560k Mt of 4600 kcal/kg NAR coal is required to be shipped in eight shipments on Fixed Price FOBT, within OCT 2015 - Q2 2016  by 8 Panamax vessels.

According to Komipo’s tender terms, the bidders are requested to propose 70,000×2 for OCT 2015 and 70,000×2 for Q4 2015 - Q1 2016 loading and 70,000×2 for Q4 2015 and 70,000×2 for Q1-Q2 2016 loading or 50,000×2 for Q4 2015 and 50,000×2 for Q1-Q2 2016 loading.

KOMIPO requires the suppliers to offer coal with the quality such as Total Moisture (As received basis) Max. 28%, Volatile Matter (Air dried basis) Min 22 Max 45%, Fixed Carbon (Air dried basis) Max 60%, Total Sulfur(As received basis) Max 1.0% and Ash (Air dried basis) Max 17% for minimum 4,600 kcal/kg coal on NAR basis.

Submissions of bids should not later than 14:00hrs on August 19, 2015 (Korean Standard Time).

source: http://coalspot.com